ChennaiFloods 🌊⚡️ Flood waters have inundated the power transformer yard of the 110KV substation of Tidel Park. Our #Tangedco team is working diligently to assess the damage and restore power to the affected areas.
#ChennaiFloods 🌊⚡️ Flood waters have inundated the power transformer yard of the 110KV substation of Tidel Park. Our #Tangedco team is working diligently to assess the damage and restore power to the affected areas. pic.twitter.com/pmj50jZH2M
— TANGEDCO Official (@TANGEDCO_Offcl) December 5, 2023
Perumbakkam 110 kV completed successfully . Power Transformer II energised and stabilised
Gumudipoondi Division Durainallur 110/33-11 KVSS 16MVA 110/11KV Power Transformer -1 PRV acted and MRT Villupuram gang testing works under progress EE General Cum MRT Villupuram
Kallakurichi Team tests Cablesand transformer healthiness ensuring work 33/11KV Kalmandapam Substation..The water logging around the areas needs healthy Ness check before energising .
Ennore Substation
110KV Ennore Substation is down with both sources faulty due insulator decapping at EHT towers in the middle of rivers. Access was challenging with help of local fishermen and boats. Now, Manali – ETPS line one location fault attended. In another location work in progress Both the locations are inside river, accessed by boats Supply to resume within 2 hrs.
Pallikaranai section 11kv kamakotti and narayanapuram feeder off 33kv Kovilabakkam sub station normalising works